What We Do

Services

Here's the full list of deck work we take on, big or small.

Home › Services

Everything we take on

Every job below is one we do ourselves across Greenfield.

Deck Installation

We set posts below Wisconsin's frost line, 42 inches down, so the deck doesn't heave every spring. Joists go in at 16 inches on center for most decking, tighter at 12 inches if you want composite or a picture-frame border. We flash the ledger board where it meets the house, because that's the spot that rots first if water gets behind it.

Deck Repair

Most repair calls start with a soft spot in the decking or a railing that wiggles when you lean on it. We pull up the bad boards, check the joists underneath for rot, and only replace what's actually failed instead of tearing off the whole deck. A loose railing post usually means the fasteners have pulled out of wet wood, and we re-anchor it with structural screws into solid framing.

Deck Staining & Sealing

Pressure-treated lumber has to dry out for a season before it'll take stain properly, so we check moisture content before we start. We pressure wash first to open the wood grain, let it dry a couple days, then apply a semi-transparent stain that lets you still see the grain. Plan on redoing this every two to three years in our climate, sooner on a deck that gets full south sun.

Custom Deck Design

Some decks have to wrap around an existing tree or step down to match a sloped yard, and that's where stock plans stop working. We draw up the layout with you, figure out where the stairs land and how the railings meet code, then build to that plan instead of making it up as we go. Multi-level decks and built-in benches start here, on paper, before any lumber shows up.

Composite Decking Installation

Composite boards expand and contract more than wood with temperature swings, so the gapping and fastening pattern has to account for that or you get waviness by year two. We run hidden fastener systems on most composite jobs so the deck surface has no visible screw heads. It costs more up front than pressure-treated, but there's no staining and no sealing, ever.

Deck Railing Repair & Installation

Wisconsin code requires 36-inch railing height on most residential decks and baluster spacing that won't let a 4-inch sphere through, and we build to that spec whether it's a repair or a new installation. Wobbly railings are almost always a post that was only toe-nailed instead of bolted through the rim joist. We re-bolt it with lag screws and through-bolts so it stays tight.

Deck Resurfacing

If the frame underneath is still solid but the decking boards are splintered, cupped, or gray from years of sun, resurfacing saves you the cost of a full rebuild. We strip off the old boards, check every joist for soft spots, and lay new decking on the existing structure, usually finishing in two to three days.

Deck Demolition & Removal

Old decks come down fast once you know what's holding them up, usually bolts through the ledger and a handful of footings. We haul away every board and fastener and check the ledger flashing on the house before we leave, since that's often why the old deck failed in the first place.

Pergolas & Deck Shade Structures

A pergola attached to an existing deck needs its own posts and footings, it can't just hang off the deck framing. We size the rafters for snow load, not just looks, since a flat-topped pergola will hold snow all winter here. Cedar and treated pine are the two options we build in most often.

Multi-Level Deck Building

A sloped backyard usually means stairs and a second level instead of one flat deck, and the framing gets more complex fast. We step the footings down with the grade and tie the levels together with stairs that meet the same rise-and-run on every step, which is a code requirement and also just safer to walk. These jobs take longer than a single-level deck, usually an extra week.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Greenfield, WI

Serving homeowners across these communities within about an hour of Greenfield.

Greenfield, WI
Milwaukee, WI
Waukesha, WI
West Allis, WI
Wauwatosa, WI
New Berlin, WI
Brookfield, WI
Franklin, WI
Oak Creek, WI
Muskego, WI
Hales Corners, WI
Common Questions

Things worth asking

Questions that come up once a deck project actually gets underway.

Do I need a permit to build a deck in Wisconsin?
Most municipalities in Wisconsin require a building permit for any deck attached to a house or raised more than 30 inches off the ground. Permit requirements typically cover footing depth, railing height, and attachment to the house structure. A reputable deck builder pulls the permit and schedules the required inspections as part of the project.
How long does it take to build a deck?
A standard single-level deck, roughly 300 to 400 square feet, usually takes 5 to 10 working days from footings to final board. Multi-level decks or those with custom features like built-in seating or pergolas can take two to three weeks. Weather delays, material backorders, and permit inspection scheduling can extend these timelines.
Can you work within a specific budget for my deck?
Deck builders can typically adjust the design to fit a budget by changing the decking material, reducing square footage, or simplifying the railing style. Pressure-treated lumber costs significantly less than composite decking, and a simpler railing design cuts both material and labor cost. Discussing a target budget upfront lets the contractor suggest where to trim without compromising the structural frame.
Do you guarantee your deck work?
Most deck builders offer a workmanship warranty covering structural issues like footing settlement or framing failure, typically for one to five years. Material warranties are separate and come from the lumber or composite manufacturer, often covering rot or fading for much longer. Ask what specifically is covered and get the warranty terms in writing before the project starts.
Will I deal with the same person throughout the project?
On most deck jobs, a single point of contact, often the lead carpenter or project owner, handles communication from the initial quote through the final walkthrough. This matters especially when unexpected issues come up mid-build, like discovering rotted framing under an old deck being replaced. Ask upfront who to call with questions once the work is underway.
What decking materials do you typically work with?
Pressure-treated pine is the most common and affordable decking material, though it requires staining or sealing every two to three years to prevent graying and splintering. Composite decking, made from recycled wood fiber and plastic, costs more upfront but requires no staining and resists rot. Cedar is a mid-range option with natural rot resistance but requires regular maintenance similar to pressure-treated lumber.
Can I still use my yard or house while the deck is being built?
Most homeowners can continue normal use of their house and yard during deck construction, with some disruption near the work area for noise and material staging. Access to a back door or patio off the deck area may be limited during framing. Discussing which entrances and yard areas must stay clear helps the crew plan material delivery and work zones.
What should I do to prepare my yard before deck construction starts?
Clearing furniture, grills, and potted plants away from the existing deck or build site gives the crew room to stage lumber and equipment. Marking the location of sprinkler lines, buried dog fencing, or shallow utility lines helps avoid damage when digging footings. Trimming back any overgrown landscaping near the work area also speeds up the first day of construction.
What happens if you find rotted wood or a problem once the old deck comes down?
Rotted ledger boards, deteriorated footings, or termite damage are common discoveries once an old deck is removed, and they have to be addressed before new construction begins. This usually means an adjustment to the original quote to cover the additional repair or replacement work. A contractor should explain the issue, show the damage, and get approval before proceeding with extra charges.
How do I maintain a deck after it's built?
Pressure-treated and cedar decking have to be cleaned and resealed every two to three years to prevent water damage and UV graying. Composite decking only requires periodic washing with soap and water to remove dirt and mildew. Checking railing posts and stair connections annually for looseness catches small problems before they become structural ones.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (414) 360-4026